The project scope includes a 109,569-square-foot train maintenance warehouse equipped with a drop table, wheel truer, two full-length service pits, storm drainage systems (including a retention pond and under-drain structures), track installation, a fuel farm, a sand system, and a train wash. Delivered under a GMP contract, the project required coordinating permit drawing approval with the local municipality and the design team, managing FFE and FT infrastructure design and installation, overseeing the QA/QC team, and supervising engineers and architects. The role involved leading a team of 12 people and managing the overall budget.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.